Last Friday, not at 9 AM as expected but about 12 AM we had all operational, here in the new building with our data center relocated to here.

It was a long working night but, even with a lot of surprises (both in hardware and other things), it all turned out to be ok (with a lot of McGiver work, nevertheless... :-) ).

If it wasn't for an unforseen efect of the protection agains address spoofing on the big cluster (the Urano/Neptune load-sharing firewall that is one of our main internal routers) and it would have been all operational by 9 AM.

Now, back to normal problem solving work and working already on the next steps....